USE CASE GUIDE | DEFERRED MAINTENANCE AT SCALE

From facility shutdowns to operational efficiency: ensuring resiliency while avoiding compliance risk

A portfolio approach to closing the deferred maintenance backlog for industrial organizations

 

Get the use case

See how a portfolio-wide approach sized and closed a deferred maintenance backlog that site-by-site tracking never fully captured.

"The productivity, reliability, and operational value of industrial energy projects can reach up to 2.5 times the value of the energy savings themselves."

— IEA, Capturing the Multiple Benefits of Energy Efficiency

Use case cover

What's Inside

  • Why site-by-site work order tracking systematically understates the true backlog
  • How a portfolio-wide assessment revealed a backlog larger than internal records showed
  • How procurement savings at scale reduced per-unit costs no single-site program could match
  • What closing the backlog at once delivers versus managing it one work order at a time

Program outcomes across 673 locations

What portfolio-scale execution delivered when site-by-site tracking was replaced with a portfolio-wide view.

$52.5M

in 10-year gross energy and maintenance savings across 673 locations

$0

upfront capital required, funded entirely by Redaptive

10,220 MT CO2e

avoided over the service term, addressing R-22 compliance exposure across the portfolio