USE CASE GUIDE | DEFERRED MAINTENANCE AT SCALE
From facility shutdowns to operational efficiency: ensuring resiliency while avoiding compliance risk
A portfolio approach to closing the deferred maintenance backlog for industrial organizations
Get the use case
See how a portfolio-wide approach sized and closed a deferred maintenance backlog that site-by-site tracking never fully captured.
"The productivity, reliability, and operational value of industrial energy projects can reach up to 2.5 times the value of the energy savings themselves."
— IEA, Capturing the Multiple Benefits of Energy Efficiency
What's Inside
- Why site-by-site work order tracking systematically understates the true backlog
- How a portfolio-wide assessment revealed a backlog larger than internal records showed
- How procurement savings at scale reduced per-unit costs no single-site program could match
- What closing the backlog at once delivers versus managing it one work order at a time
Program outcomes across 673 locations
What portfolio-scale execution delivered when site-by-site tracking was replaced with a portfolio-wide view.
$52.5M
in 10-year gross energy and maintenance savings across 673 locations
$0
upfront capital required, funded entirely by Redaptive
10,220 MT CO2e
avoided over the service term, addressing R-22 compliance exposure across the portfolio